1. Preparatory work for installation of sunshine board
①Before installing the sunshine board, check whether the verticality, elevation, height and levelness of the main support of the steel structure meet the design requirements, and pay special attention to the re-examination of the installation hole position;
②Before installation, the surface and bottom of the steel tank must be cleaned locally with a steel brush. The U-shaped steel tank at the bottom of the connecting glass should be added with neoprene spacers at 1/4 of the width from the edge of the glass;
③Before installation, the sunshine board should be cleaned, and the number of construction workers should be determined according to the weight and specifications of the sunshine board;
④Before installation, check whether the installation position is accurate;
2. When installing the sunshine board on site, you should first assemble the fixed bead and the sunshine board on the installation platform, and then install it with the frame.
In order to ensure the air-tightness and water-tightness of the layering, glass glue must be used for sealing;
3. After on-site installation, adjust the up, down, left, and right positions to ensure that the horizontal deviation of the sun panel is within the allowable range;
Royal Blue Sunshine Board
4. After all the sun panels are adjusted, the flatness of the overall facade should be checked;
5. Glue the sunshine board.
① Use absolute alcohol or petroleum ether, ethane and a clean towel to clean the glued parts of the sun board and steel tank before gluing.
②The gap between the bottom of the solar panel and the steel channel should be plugged tightly with foam rubber strips to ensure straightness, and the glue thickness of the net height of 8mm-12mm should be reserved.
③Before gluing, paste protective tape on the part that needs to be glued, paying attention to the straight line between the tape and the glue.
④ The glue should be applied continuously and evenly. The general order of operation is: first horizontal seam and then vertical seam; vertical seam should be carried out from top to bottom. After the glue is full, check whether there are bubbles, voids, or broken seams inside. , Inclusions, if any, should be dealt with in time.
⑤When gluing the next day, the glue joints should be cleaned of the glue heads, and the glue tails that were glued the previous time should be removed to ensure a tight connection between the two glues.
⑥After the glass glue is modified, the tape pasted on the sun board should be removed quickly. After the glass glue is cured, the inner and outer sun boards should be cleaned, and protective signs should be made.